Wednesday, March 13, 2018
Today was another really nice day in Baton Rouge. It was a little windy this afternoon but no rain again today. Three days in a row during the work week that we could work outside – that may be a record for this trip. Nice.
Lisa led us in devotion this morning referencing “A Charlie Brown Christmas”. She reminded us that everyone always tried to separate Linus from his blue security blanket. Linus drops his blanket when he uttered the works “Fear Not.” The birth of Jesus separates us from our fears. The birth of Jesus allows us to drop our false security blankets. Linus picked his blanked back up. Why? Don’t we all do that too? The show ends with the kids worshiping in song. Linus then leaves the blanket at the base of the tree for good. Jesus wants us to cling to him, not the false securities we sometime cling to. We need to leave our worries, insecurities, anxiety, at the foot of the cross. We had good discussion and several of us plan to watch the movie again sometime soon. Thanks, Lisa and Mark!
Today Gumby was in the mix again. This morning Mary, Randy and Gary went back to Harry’s house to complete the hand rails on the steps. They completed the job by lunch time and joined Anne, Harry, Janet and Nancy at Norwich to continue the drywall finishing. Stel and Jodi went with Max to Baker first thing this morning. They needed to be familiar with that job site since they will take over lead this weekend. Butch, Cheri, Lisa and Mark also started the day at Baker. Butch and Mark were working on the water heater in Pam’s travel trailer while Cheri and Lisa were still working on drywall. After lunch we had them join us at Norwich too. We brought all hands on deck and try to get that house finished before we leave. Gumby struck again. While we were all eating lunch together – a first for this project – we learned our scope of work has changed. We are now going to install the very large roll in handicap shower in the master bath. We are also now going to finish the ceilings to be ready for heavy texture. They need us to move on to other houses, but the needs are growing at Norwich. So, the two bedrooms and hall that we had marked as “Done” are now not done and we will be sanding and mudding the ceilings in those places again. There is much work to be done to install the shower, such as frame in a wall and bust out a portion of the concrete slap and move the drain. It’s God’s work. We are just the hands and feet. Sorry, Stel and Jodi. We aren’t going to get this one finished for you. This afternoon we had to remove the back door to get the shower in the house. We also began removing a portion of the master bedroom wall to allow the shower to be moved to the master bath. All in a days work.

This afternoon Stel and Max rode with Darryl to another house that needs work. After they got there it became evident that NOMADS will not be working on this house anytime soon. It needs the roof repaired before any inside work can be started. However, while there that did see an interesting bathroom fixture and a snake they had not seen before.
Today was Mary’s birthday so we all went out to dinner to a new-to-us restaurant, Montalbano’s Seafood. The food was very good, the company great and then we topped it off with a birthday cake. Happy Birthday Mary! It was another good day.
