2026 Muskogee DR Week 3 (Our Week 2)

Sunday, October 25, 2026

This week we were still in Muskogee, OK, with a team of 12 people continuing to work on the same trailer as last week.  There have been times when it was somewhat crowded and very noisy in the double-wide mobile home, but we accomplished a lot.  The weather improved with no more 90 degree days or heavy rain.  We were even wearing jackets in the early mornings.  By Thursday afternoon the front deck was completed, all the sub-flooring had been repaired or replaced, most of the luxury vinyl plank flooring had been installed in the entire trailer, most of the drywall had been installed, the master bath was almost complete and work on the central bath was begun.  The back deck was completed, the upper cabinets in the kitchen were repaired, the lower cabinets were stained and ready to install.  There is still drywall to be finished.  It was a dedicated, hardworking crew.  We were all pretty tired by Thursday night but another dinner together at one of Muskogee’s good bar-b-que restaurants made everything better.

Leave a Reply