Completions In Lumberton

Wednesday, December 12, 2018

Another frosty morningIt was another cold 28 degrees this morning. Several of our team members water was frozen today. It was not predicted to get below 30 so no one brought in their hoses. Oops. Fortunately Max did leave the light on in the water bay but he also left our hose and pressure valve out in the cold. We had water, so that was nice.

Carol shared the story of the origin of the birthday cake for Jesus at our devotion time. We discussed our various family traditions regarding Christmas and ways of reminding ourselves and others of the real meaning of Christmas. Thanks Carol for sharing.

After devotion we all got our work assignments. Phillip and Cindy went out to Mary and Jim’s and finished the threshold strip from the bath to the bedroom. We still need to get the debris removed but we think Jeff will have someone else do that. Now Mary and Jim’s work is complete.

Mary Ann, Carol and Dave went back to Jackie’s and worked on touching up the paint, spent lots more time removing masking tape and completed the final cleanup there. Jackie’s house is complete.

Max, Anne, Nancy, Gary and Bruce went back out to Terry’s house. Bruce, Gary, and Max headed on over to Elsie and Bruce’s house as soon as the sun had warmed things up a bit. They soon discovered, however, in the winter the sun never really reaches the roof of their house so Max and Gary were cold sitting on the roof to make repairs. They completed the installation of the new section of roof and then made some repairs to the older roof. Elsie and Bruce’s house is now complete.

Anne and Nancy completed the installation of the vinyl plank flooring. Each piece on the last row had to be cut with the jig saw which Nancy did like a pro. (She just learned to use the jig saw yesterday.) And it looks very good in our opinion. Next was the installation of the base boards. Gene arrived and helped us with this task since neither Nancy nor Anne had used his small miter saw. Today Nancy learned to used the miter saw. After cutting the baseboard we nailed it in place with Max’s new Dewalt nailer, another new skill for Nancy. After installing the baseboard there was caulking and painting. While the ladies worked inside, Gene worked on the completion of the deck railings. Soon Phillip and Cindy arrived and Cindy joined Gene on the deck while Phillip designed and installed another transition strip. He did a great job! By the end of the day Terry’s house was complete.

We have completed five houses in the last few days. Tomorrow we will do Bible presentations to all five homeowners. This is truly a unique situation. We have never completed this many houses all at the same time. Never made more than three presentations in a day. Another first for all of us on the team, is that we are leaving no unfinished homes that we started. Yes, there are more homes in Lumberton that need work, but none of those homes were assigned to us. We have completed all assigned duties. A really nice way to finish our time here in Lumberton.

One thought on “Completions In Lumberton”

  1. Wow! Five completions! That’s wonderful! Also enjoyed the subtle New Tool Gloat “Max’s new Dewalt nailer”. Now Rita wants one!

    Dave

    >

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s